It has a project value of PhP100,895,679 and includes the supply and installation of a solar power plant with a minimum of 1 MegaWattPeak (DC) capacity. The Maynilad Solar Power Farm was constructed on top of the AWSOP Reservoir and Pump Stations (ARPS*) with approximately 8,250 square meters. It augments the power supply for the La Mesa Pumping Station North C. It became partially operational on May 2021, fully operational on Dec. 2021.